paperpk.com
|
Peshawar Development Authority Peshawar Tender Notice in Kppra newspaper of 09 September, 2024 and more Tenders and Auction Ads of Peshawar Development Authority Peshawar Tender Notice ( ) 2024 published in Pakistani newspaper or PPRA |
Construction,Civil Works,Repair and Maintenance,Reconstruction,Roads Construction And Reparin,Construction Of Musjid in Streets
****** Result for Image/Page 1 ******
GOVERNMENT OF
PESIAWAR AUTUORITV
(NOTICE INVITJNG F..TENPERINGI
Sealed bids on the basis of "Single stage Single Envelope System" under Rule 14 (2) (a) of KPPRA
Rules 2014, are hereby invited from the contractors / firms enlisted with the Provincial Enlistment Committee
Khyber Pakhtunkhwa I PDA for the cu year and registeted with Pakistan Engineering Council (PEC) for the
cu year having sufficient experience in the field of work given below, on percentage above / below on the
BOQtEngineer cost estimate based on MRS 2022 (Yd Bi Annual).
Name of Work
Major Head:
Rehabilitation / Up-
gradation of Mosques
in Phase V
1
Sub Head:•
Construction of Masjid
in Street 6-A Sector C-
2 Hayatabad ( Adjacent
to DG House
Required
Category
or PEC
and
above
Estimate
d Cost
Rs In
Million
4.46
Date &
Oldding
Bid
time or
Security/ doeu menis
Earnest
Money
Rs
89500/
O
Fee
20001.
Submissio
25/09/2024
11:00 AM
Date & Time
time or Limit
Opening
As Per
25/09/2024
work
11:30 AM
order
1. Tender documents/ BOQ can ß?dbwnloaded up to one day prior from the date Of opening
Of Tender from PDA web
voywnda.kp.goy,pk.
2. (two percent) earnestJÜOn idsecurity of the Engineer Cost Estimate must be accompanied in the shape
of Call Deposit in name Director General, Peshawar Development Authority Peshawar, from scheduled
their bids up to a limit Of below Engineer estimate shall submit bid security @ 2%
3. The contractors
only of Engineer in accordance with the KPPRA notification S.R.O. (14yvoI: 01-24J2021-22/6S6S-71
dated
tractors quoting their bids mote than 10% below up to 20% below on Engineers Estimate shall
*übtnit along with their bids 8% additional Security of Engineer Estimated cost in addition to 2% bid
security, If the bid is not accompanied with the required amount Of Addition Security. then it will be
considered as non•responsive and the 2% bid security shall be forfeited in favor of Government and the
second lowest bidder and so on Will be considered accordingly.
(Similarly, a contractor quoting bid more than 20% below shall submit with his bid an additional
security on engineer estimated cost equal to the diffial amount Of submitted bid and Engineers
Estimate along with detailed rate analysis). In case of more than 20% below bids, if the bid is not
accompanied by the detailed rate analysis and I or required amount of additional security. then the said
bid shall be considered as non- All thc securities submitted along with such non-responsive
bid shall be forfeited in favor of Governmcnt and the lowest bidder and so on witl be considered
accordingly,
og Sep, 2024)
CopyRight & copy; 2024 & Trademark PaperPk, Limited Rights.
x