NOTICE INVITING E-BIDDING
Sealed tenders based on MRS-2022,i Non MRS-items for the below mentioned works are hereby invited on the basis of Sinqle staqe sinqle envelope procedure
from the government contractors registered with PEC and enlisted with C&W Department as per Centralized Enlistment Policy of the Government of Khyber
Pakhtun khwa for cu Financial yearas per following schedule:
Details of Solar Works are:
Work
No
1
2
3
4
5
6
7
8
9
10
11
12
Work Name
Installation Solar Lights in Khar Bazar (129
Units)
Installation Solar Lights in Raghagan Bazar
(66 Units)
Installation Solar Lights in Nawagai Bazar (96
Units)
Installation Solar Lights In Mamol & Barkhlozo
Bazar (40 Units)
Solarizatvon of Existing Bore / Well with OHT
at Zaray (Only Solarization)
Solarization of Existing Bore Well with OHT
at Badan Qila (Only Solarizauon)
Solarization of Existing Bore Well With OHT
at Kanseer (Only Solarization)
Solarization of Existing Bore Well with OHT
at Ghahi Asad (Only Solarization)
Solarization of Existing Bore / Well with OHT
atJamsheed Nawagai (Only Solarization)
Solarization of Existing Bore I Well with OHT
at Ber Kemal Loi Mamund (Only Solarization)
Solarization of Existing Bore I Well with OHT
atAIimano Kali Salarza (Only Solarization)
Installation of Solar System on Existing
Source at Jannat Shah
Estimated
Cost (M)
38.593
19.745
29262
12.418
0 685
0.672
0672
0.709
0.672
OG72
0.621
Bid
SecuriW
(Rupees)
771860
394900
585240
248360
13697
13440
13440
13440
14181
13440
13440
12420
Last datelime
of submission
of electronic
tender form
18/09/2024
at 12:00am
(Mid Night)
dn
do
do
Last date/6me of
submission of
electronic tender
form (Hard Copy)
18/09/2024
at 12:00pm
(Noon)
mdo—
Date/time of
opening of Time of
electronic compleüon
bid
18/09/2024
at 12:30Pm
(noon)
Work Order
mdo—
Terms and Conditions;
1
2
3,
4
5,
6.
7.
8.
9.
10.
12.
13.
ld
15.
16.
17.
18.
19.
Tender form can be filled online and downloaded from the official website of LGE&RDD (v"/lgkp.gov.pk) after publishing NIT.
Thesecuritiesshall be inshapeofcall deposit in favoroftheAssistant Director LG&RDO aut.
The eligible contractors/firms must have
Pakistan Engineering Council Relevant Codes.
Thecontractorsquotingtheirbidsuptoalimitof10%belowEngineerEstirnage
The contractors quoting their bids more than below up to 20% belowgnkngineers' Estimate shall submit along with thev bids 8% Additional Security of
Engineer's Estimated cost in addition to 2% bid security. If the bid is nc(accémpanied with the required amount of additional security, then it will be considered as
nan-responsive and the 2% bld security shall be forfeited in favor of and the second lowest bidder and so on will be considered accordingly.
Similarly, a contractor, quoting bid more than 20% below shall submityith his bid an additional security on Engineer's Estimated cost equal to the diffial
amount of submitted bid and Engineers' Estimate along with d9iajIeg rate analysis- In case of more than 20% below bids. if the bid is not accompanied by the
detailed rate analysis and I or required amount of additionalsecåritycåhen said bid shall be considered as non-responsive. All the securities submitted along with
such nan-responsive bid shall be foffeited in favor of Governmeåt and the lowest bidder and so on will be considered accordingly
In case detailed rate analysis submitted with the bids the Procuring Entity, not convincing, the Head of the Procuring Entity may declare such bid as
nn-responsive without any forfeiture of bid securitie$and reasons thereof
The procuring entity may offer the contract to n
dder after due diligence in the context of financial difference between such two bids or may adVertise
procurementopponunity afresh
Printed Electronic bid (both Original & Duplicate comes) may be delivered through courier service.
The call deposits i.e. bid security forthe wprk /Conttact must be prepared after publishing of N ITL
The time forcompletion ofscheme shall be as per order, The contractor or his representative can be present at time ofopening of electronic bids opemng.
In case of tie idraw amongst the responéivebidders, the bid may be decided through free toss which shall be considered as final.
Any electronic bidder who provides false, or materially inaccurate or incomplete or do not send information in hard form will be disqualified as per KPPRAAct
Section 29 ( 1) read with KPPRA Rule 143). Furthermore, the Procuring Entity/Executing Agency will recommend and sent cases fordebamng/Blacklisung and will
initiate I' take action in light of approved procedure l' mechanism as per KPPRAAct section 29 (2) read with KPPRA Rule (44).
Bids will remain valid for 90 daySfrom the closing date of bids.
The firms/contractors whg Wants to participate in tendering process may approach Directorate General LG&RDD Peshawar within two days before closing time of
electronic apply for uploadinåtheir names on the official website i,e,
All bidders are required to be registered with Khyber Pakhtunkhwa RevenueAuthority (KPRA) under the Khyber Pakhtunkhwa FinanceAct 2013,
The PEC and KPRA registration (Active Tax Payer} must be valid for cu Financial Year and attached with the Electronic Bids,
The successful bidder/contractor shall be responsible to produce satisfactory certificate of the work-done from concerned MPA and Technical committee
constituted for the purpose before submission of bill for payment,
Any addition made in the terms & conditions in NIT advertised shall be implemented as per KPPRAAct & Rules
N ate: - Those contractors/Firms whom intends to quote financial rates on e-bidding system should first assess their firms as per eligibility criteria given below and
if there is any one or more than one eligibility criteria which the firm cannot complete. will be considered as non-responsive and work will be awarded to next
bidder, ih full letter & spirit to KPPRA rules.
Incomplete bids or in-ellgible bids will be considered as Nan-responsive & will be sent fordebarring black listtng.
Attested CNIC & BOQ 2% CDR
Signed online Tender form Hard copy,
Enlistment with LG&RDD Department
ASSISTANT ENGINEER
LG & RDD BAJAUR
O Newspaper ( 29 Aug, 2024)
Registration with PEC in relevant category & codes
NTNSTRN,KPRAactiveforcuFY
ASSISTANT DIRECTOR
LG & RDD BAJAUR
CopyRight & copy; 2024 & Trademark PaperPk, Limited Rights.
x