paperpk.com
|
Haripur Irrigation Division Haripur Tender Notice in Express newspaper of 13 July, 2024 and more Tenders and Auction Ads of Haripur Irrigation Division Haripur Tender Notice ( ) 2024 published in Pakistani newspaper or PPRA |
Construction,Civil Works,Repair and Maintenance,Reconstruction,Roads Construction And Reparing,Procurement Of Cleaing Of Drainage System,Janitorial Works
,
****** Result for Image/Page 1 ******
GALLOP TENDER NOTICE INVITING TENDER
GOVT: OF KHYBER PAKHTUNKHWA
IRRIGATION DEPARTMENT NOTICE INVITING E-BIDDING
(Single Stage Single Envelope Procedure)
Executive Engineer Haripur Irrigation Division Haripur, Govemment of Khyber Pakhtunkhwa invites Electronic Bids from
eligible firms I bidders in accordance with KPPRA Procurement Rules 2014 on Single Stage Single Envelope procedure for
the following Works:
Work Name
of Drainaqe System of Urbpn qrea
A Nullah} of District Abbottabad)
Demand & Drainage Control
Clearance of Silt and Debris from small Industry to Jab Pul (RD 0-6500 in
Jab Nullah DistrictAbbottabad.
Clearance of Silt and Debris from Jab Pul to Hassan Town PMA Kakol Road
2
(RD 6500-13000) in Jab Nullah District Abbottabad.
Clearance of Sift and Debris from Jab Pul to Hassan Town PMA Kakol Road
3
to Kalapul (RD 13000-20000) in Jab Nullah District Abbottabad.
Dismantling and reconstruction of Box Culvert at Jab Nullah District
4
Abbottabad
5 ImprovementofWeakBanksofJab NullahDistrictAbbottabad
TERMS & CONDITIONS
E/ cost Rs. Bid Security Time
in (Million) + Stamp Duty Limit
11970
1.930
1490
1720
43400
42600
33800
38400
37800
3
Months
1.
2.
3.
4.
5,
6.
7.
8.
9.
10.
11.
Bid Solicitation documents including Instructions to Bidders can be downloaded from Irrigation website
http:/www.irrigation.gkp.pk/ as wee as KPPRA webs'
envise bids submitted without these documents (duly
filled} will be considered nan-responsive,
Bid Solicitation documents issued to the bidders,
uirements foreligible bidder and other important terms and
conditions.
Electronic Bidding shall be done on " Above [Belowgystem" on BOQ I' Engineer's Estimate, based on the MRSNSI
where applicable. Only two digits after the decimal pintshall be considered for evaluation purpose.
The Bidder should submit through courier 02P4Bid Security sealed in envelope of the estimated cost in the shape ofCall
Deposit (Original) as per KPPRA instructions; rules and other government notifications issued from time to time.
The employer has the authority to rejept•apy bid orall the bids assigning cogent reasons.
Bid security of the It and 3's Bidder for the specific work will be retained by the department for one
week after issuance of letter ofpce#tånce to the successful bidder
All the bidders / Firms must be@gistered with the Khyber Pakhtunkhwa RevenueAuthority.
The contractors quoting theirbjdS more than below upto 20% below on Engineers Estimate shall submit along with
their bids 8% Additional security of Engineers estimated cost in addition to 2% bid security, If the bid is not accompanied
with the required amountof additional security then it will be considered as non responsive, and 2% bid security shall be
forfeited in in favour vemment.
Ifa contractorqup 'd more than 20% below shall submit with his bid an additional security on Engineers estimated
cost equal to the diffial amount of submitted bid on Engineers estimate along with detailed rate analysis. In case of
more than 20% below bids, if the bid is not accompanied by the detailed rate analysis or required amount of additional
security, then the bid shall be considered non responsive, all the securities submitted along with such non responsive bid
shall be forfeited in favour of government and the 2nd lowest bidderand so on will be considered accordingly.
The Contractors must prepare their Cdrs i.e 2% E/M &Additional security (if any) in the name of Executive Engineer
Haripur Irrigation Division Haripur
The last date forbid submission is [email protected] Noon which will be opened on the same day at 12.30 PM in the
office of the Executive Engineer Haripur Irrigation Division Haripur in front of contractors and their representatives who
wishes to attend.
U Newspaper
EXECUTIVE ENGINEER
Hari ur Irri ation Division, Hari ur
u , 'ZUZ4
CopyRight & copy; 2024 & Trademark PaperPk, Limited Rights.
x