paperpk.com
|
Pakistan Navy Dockyard Karachi Tender Notice in Dawn newspaper of 08 July, 2024 and more Tenders and Auction Ads of Pakistan Navy Dockyard Karachi Tender Notice ( ) 2024 published in Pakistani newspaper or PPRA |
Refurbishment Of Self Propelled Articulting Boom, Rectification Of Platform Circut
,
****** Result for Image/Page 1 ******
PAKISTAN NAVY DOCKYARD
INVITATION TENDER NOTICE FOR REPAIR/
REFURBISHMENT OF SELF-PROPELLED ARTICULATING
Scope of Work
Subbmision of
Technical &
Commercial
offers
Tender can be
purchased
Date of
O nin Tende
Qualification of
firms/terms and
conditions
BOOM (GENIE)
a, Defect Rectification of Platform Control Circut
b. Defect Rectification of Group Control Computer ALC•1000
c. Defect Rectification of Engine ECU Faults and Satisfactory trials
di Rectification of Genie Platform Faults
e.Calibration of Platform and repair/ refurbishment deteriorated wiring/
sensors
f.Catibration of All Sensors installed in Genie for satisfactory operation
g.Calibration of Primary and Secondary Boom alongwith Load Capacity
trials with full boom extension (i e 138 feet height)
h.Repair/ refurbishment of all hydraulic hoses where applicable and
satisfactory test trials after repair of hydraulic system
j. Rectification of all Faults and Full Functional Test/ trials from Engine
side and Operator Cabin side
k. Repair/ Refurbishment of Operator Cabin Joystick Panel Plat
l. Technical & Operational Functional checks and trials
m. 25% Overload triats after completion of repair/ refurbishment
GST Registered Firms are required to submit technical and commercial
offers separately in sealed envelope to PN Dockyard by 1130
hours on 24 July 2024
Tender document and technical" s may be obtained against tender
fee (Rs 5000/-) from GM (SS) at PN Dockyard Karachi during
0900 to 1400 hrs. (021-48568183)
25July 2024 120
•Offer will be accepta subject to length of experience (detail of general
and specified), petitive cost and minimum completion time of job.
•Submiss
py of NTN and GST certificates
IS09
015 certification (if any)
• The ity of offer must not be less than 06 month
• ne year warranty/ guarantee after completion of satisfactory job
yment will be done after final acceptance trials
•The statement is added as "the procunng agency has the right to
accept or reject all bids or proposals at any time prior to the acceptance
of a bid or proposals"'
Note: Any wrong or misleading information by the firm or company shall
lead disqualification of firm for competing in the above projects The
undersigned reserves the right to reject any or all quotations without
assigning any reason
GENERAL MANAGER
Shore Services PN Dockyard Karachi
O Newspaper ( 08 Jul, 2024)
CopyRight & copy; 2024 & Trademark PaperPk, Limited Rights.
x